Sunday, July 12, 2009

Hike in Taylor Creek Park

On Sunday July 5, I led my 3rd of 6 hikes for the summer. It was a warm sunny day and 52 people showed up. The route I chose went from the Victoria Park Subway Station and went through Taylor Creek Park to the Don River. I then led the hike along a biking trail known as "The Flats". The hike ended at Pottery Road and Broadview. After the hike a number of hikers went for a beverage (or two) at Whistler's Bar and Grill.

My next hike is scheduled for Sunday July 19, 1 PM, starting at Overlea Blvd and Thorncliffe Park Drive (east). It will head down the Don ending up at the Distillery District.


Map of the hike. I prepared this map for a hiker who wanted to know where the best drop out points were. These are marked on the map.


Getting started in Taylor Creek Park


Walking by the garbage dump in Stan Wadlow Park


Making our way along a trail in the woods


Climbing over a trail obstacle


A forest setting

I led the hike by the Elevated Wetlands. We got to walk underneath a waterfall!

Friday, July 10, 2009

Garbage in the Don

I've been active in the Don Valley for several years removing garbage from natural areas. Now it appears that the city is putting it right back. The Don is now the dubious host for a number of temporary city dumps, courtesy of the ongoing civic workers strike. The first one was setup next to Taylor-Massey Creek in the parking lot at the foot of Stan Wadlow Park.


The dump

The garbage pile

I have also heard that another site is opening soon in Wilket Creek Park near Leslie and Eglinton. In addition to the legal sites there are now a few examples of illegal dumping. If the civic workers strike lasts much longer I am sure we will see more of these.


Illegal dump near Pottery Road

Another dump next to Pottery Road

This looks more like homeless garbage but is still an illegal dump. Found next to Lower Don Trail just north of Bloor Street Bridge.

Wednesday, July 08, 2009

Laying Track

I happened by the Queen St. bridge over the Don last Saturday and noticed some activity on the railway tracks that parallel the river. Workers had removed some track underneath the Eastern Ave/Front St. bridge and were replacing it. They were also replacing a switch (see track in foreground) but I couldn't stay for that part. I took these photos before going on my way home.


Construction scene

Closeup of same

Putting the new track in place

More track action.

Friday, July 03, 2009

Relocated Buildings

Previously I have blogged about two building in the Don that have recently been moved. Here are some photos of the final resting places.


St. Matthews lawn bowling club. Moved from Gerrard St. East to Broadview Ave.


The Don Station. Moved from Todmorden Mills to the up and coming railway museum at the John Street Roundhouse. The Toronto Railway Historical Association has an interesting blog about activities underway at the roundhouse.

Sunday, June 28, 2009

Coxwell Sanitary Sewer Update


Sewer grate c1959. Located near the mouth of Taylor-Massey Creek and demarcates the merging of 3 sewer mains into the Coxwell Sanitary Sewer. Warning: the odour from this access tunnel is very strong and shouldn't be approached by those with a weak stomach!

After a flurry of fairly high profile news items earlier this year, the story of the Coxwell sanitary sewer problems has fallen off the radar. This does not mean that work has slowed down. Far from it. Toronto Water has been very busy with a wide range of activities from setting up monitoring devices to developing contingency plans in the event of a failure of the sewer to plans that will lead to eventual repair of the sewer.

There are two foreseeable outcomes. The first is that the sewer fails in the near future which would have dire consequences for the Don River. The second (and much more likely) course of events is that Toronto Water successfully completes repairs on the sewer main and everything works out OK.

Let me start with the bad news scenario. Since the damage to the sewer was discovered, the city has taken steps to make plans in the event of a failure. No one knows when the damage to the sewer occurred or how extensive the damage is. Nor are they sure how long the sewer will last. It could fail today or it could last another 60 years. Given this situation city staff have to plan for the worst. In the event of a failure the plan is to divert the sewage into the Don River. The flow in the pipe is about 6 m3/s or about 4 times the normal flow of the Don River. The effluent would flow all the way down the river to the harbour. The plan calls for the effluent to be treated in the Keating Channel which would remove the worst of the flow but the remaining water would be highly polluted.

The effect of this would be catastrophic. All oxygen would be removed from the river and everything now living in the river would die. Water in the harbour would be highly anaerobic and E. coli levels would be through the ceiling. The combined sewer and river flow would be contained in the river channel but a rainstorm during this flow would likely cause the river to overflow the banks causing sewage laden waters to flood the lower Don Valley. No matter how you look at it, a collapse would be a major environmental disaster.

In the meantime work is underway to build a bypass around the damaged pipe. Two options are being evaluated, a temporary bypass and a permanent bypass. The temporary bypass would involve constructing one or more pipes above ground. The pipes would extend from the bottom of the valley near the mouth of Taylor-Massey Creek up to the corner of Coxwell and O'Connor. A shaft would be dug at that corner back down to the pipe. The sewer contents would be pumped up the side of the valley and back down the shaft to reenter the pipe downstream from the damaged section.

The permanent bypass solution would tunnel underground roughly parallel to the existing pipe and create a diversion around the damaged section. Either solution would allow engineers to enter the existing pipe to initiate repairs. The timeline for both options is 9-12 months and would cost about $30 million. The temporary would take a little less time but would be more damaging to the natural landscape of the valley. Also the temporary solution allows for only one oppotunity for repairs. Since the cost for both options is roughly similar and the timelines are not that far apart, city staff are leaning towards the permanent solution.

It is good to know that the city is taking the situation very seriously and I am confident that the plans in place are sufficient to produce a positive outcome. I rate the possibility of failure of the sewer to be very low. I am reasonably certain that by the end of this project we will again have a working sewer and the Don River will continue to flow without the added complication of input from the Coxwell sewer.

For anyone who wants additional information on this subject, you can view Toronto Water's slideshow presentation to the Public Works Committee from January 2009.

Wednesday, June 24, 2009

Sunday Hike in the Don

This summer I am leading a series of hikes in the Don. This past Sunday was the second of six hikes. It started at York Mills and Bayview and traversed open sections of Wilket Creek, part of the West Don and all the open sections of Burke Brook. It was a nice day and 50 people showed up! Shepherding this many people is a challenge and things slowed down considerably along Burke Brook which had some very muddy sections including a mudslide. Getting around these areas was very time consuming. Nevertheless, everybody enjoyed themselves and I received several positive reviews.

My next hike will be on Sunday July 5, 1 PM starting at the entrance of Victoria Park subway station. You can check the Toronto Bruce Trail Club website for details. Look under urban hikes. Here a few pictures from the day's travels.


Starting the hike in a park at York Mills and Bayview.


Walking through Windfields Park.


Some ducks were also enjoying the fine weather.


We passed through the Toronto Botanical Gardens where many things were in bloom.


Getting down a muddy slope was a little tricky but we persevered.


Lending a helping hand across a plank bridge.


Making our way across a recent mudslide took some time.


We also went through Alexander Muir Gardens in the Blythwood Ravine.


Enjoying a relaxing pint at the end of the hike at the Safari Bar and Grill. About a dozen hikers persevered with me to the end.